Current Status of the Proposed
Landfill: The Solid Waste Permitting Process for Municipal, Rubble, and Industrial Waste Landfills In Maryland: The Maryland Department of the Environment (MDE) issues Refuse Disposal Permits for sanitary landfills and other waste disposal facilities under the authority of the Environment Article, §9-204 of the Annotated Code of Maryland, and regulations at COMAR 26.04.07. The following steps have been instituted to insure the complete review of applications for Refuse Disposal Permits for landfills: PHASE I - Preliminary Information - Reviewed to see if there are any major, readily-identifiable issues such as endangered species, wetlands, floodplains, Scenic Rivers, Critical Areas, historical sites, karst (limestone), proximity to airports, or regulation under the Highway Beautification Act of 1965. The application is sent to the County government and other agencies; application is held at Phase I until the County affirms that the project has all necessary local zoning and land-use approvals, and is in conformance with the Countys 10-year Solid Waste Master Plan. A Public Informational Meeting is scheduled and held to inform the local community of the application. This meeting is held on a weeknight near the proposed landfill site, and is advertised by mailings to the property owners within 1000 feet of the site and the elected legislative representatives for the area. Also, notices are published in a local newspaper at least once a week for two weeks prior to the meeting. Representatives of MDE and the applicant are present to provide information about the application process and the proposed activity. Comments received from other agencies help MDE decide whether to proceed with the application process, and if so, what other permits or approvals may be required (e.g., Army Corps of Engineers wetlands permit, etc). PHASE II - Geological and Hydrological Report - A site-specific environmental investigation of the property based on borings and wells installed across the site. The report must be prepared by a geologist or geotechnical engineer acceptable to the Department, and must describe the soils, geology, meteorology and hydrology of the proposed site. The report provides further definition of wetlands, floodplains, historical sites (if needed), and other information needed for further design and monitoring plan development. This report is principally reviewed by MDE but is also distributed to other interested agencies, including the Geological Surveys, the Department of Natural Resources, and the Army Corps of Engineers. PHASE III - Engineering Report - Detailed Plans, operating manuals, contingency plans, and monitoring plans. These plans depict the nature and function of the pollution control systems; how the landfill will be built and operated; how it will be monitored; the types of equipment and personnel to be used; what the initial and final elevations will be; a conceptual plan for closure and postclosure use of the facility; and contingency plans for dealing with operational problems that sometimes occur at landfills (fires, equipment breakdown, etc.) in order to prevent impact to the environment or the community. This report is principally reviewed by MDE but is also distributed to other interested agencies. Before final approval, the plan must be signed and sealed by a Registered Professional Engineer, and the sediment and erosion control plan approved by the local Soil Conservation District or other appropriate agency. Plans may go through several revisions before final approval. INTERNAL
REVIEW & PREPARATION PUBLIC COMMENT (Phase V) - A formal Public Hearing is scheduled and held to obtain comment from the local community concerning the application.It is generally held on a weeknight at a location near the proposed landfill site, and is advertised by mailings to owners of property within 1000 feet of the proposed site, and the elected legislative representatives for the area, as well as by publication of notices in a local newspaper at least once a week for two weeks prior to the Public Hearing. The Public Record is generally left open for 45 days, during which time the Hearing takes place, so that interested individuals can submit additional written testimony or evidence for consideration. If this request for permits reaches Phase V, there will be a public hearing. The public hearing will be sponsored by MDE. This will be YOUR LAST CHANCE to voice your concerns and objections to this landfill. Your voice will have an impact on the State's final decision. How can you make a positive impact at the final public hearing? Voice your concerns in the following areas: 1. How
the landfill will affect the health, safety, and welfare of you and
your family; If and when held, this public hearing will be posted on this website giving date, time, and location. PLEASE
BE THERE! For Landclearing Debris Landfills and Incinerators: Phases I, III, IV, V and the Final Determination are applicable. For Transfer Stations and Processing Facilities: Phases I, III, and IV are applicable. For more information, please contact the Solid Waste Program at (410) 631-3424. Please note that this is just a summary of the requirements of Maryland State laws and regulations, cited in part above. To view the Solid Waste Management Regulations, visit the Division of State Documents website at www.dsd.state.md.us follow the link to COMAR Online, and search for Title 26, Subtitle .04, Chapter .07, Solid Waste Management. Used with permission
© www.StopOdentonLandfill.com |